Leading the world in
energy absorption

Latest Case Studies

  • 11th July 2012
  • Posted in:
    • Elevator

3 and 4 World Trade Center - Manhattan - New York

#

Schindler was commissioned to install a variety of elevators at an assortment of speeds and load masses into the new World Trade Center towers 3 and 4 - all part of the new World Trade Center complex in Lower Manhattan, New York City

Read More
  • 1st June 2012
  • Posted in:
    • Industrial

Daimler advanced drive simulator, Sindelfingen

#

Daimler has recently put the world's most advanced drive simulator in operation. Oleo provided 3m stroke buffers, and specially adapted the metering to support the simulator in the event that the proximity switches or sensors were to fail.

Read More
  • 1st May 2012
  • Posted in:
    • Buffer Stops

Baker Street Station - London

#

Baker Street Underground station is one of the oldest stations on the London Underground and services a number of lines including Bakerloo, Circle, Hammersmith, Jubilee and Metropolitan.

Read More
  • 1st May 2012
  • Posted in:
    • Rail

Siemens Avanto tram train crash protection

#

Oleo produced a design in co-operation with Siemens, for two 3-stage parallel telescopic struts to carry a beam with anti climbing profile and buffing plates.

Read More
  • 1st May 2012
  • Posted in:
    • Rail

Flirt emergency buffer

#

Oleo was commissioned to design and manufacture a hybrid two stage emergency buffer for the Stadler Flirt project which could be mounted directly onto the car structure with minimal rear protection.

Read More